Costco HQ

Project Name: Costco HQ
Location: Issaquah, WA
GC: Jackson Dean Construction
Architect: MG2
About: It includes Schuco triple glazed unitized and stick curtainwall systems. There are 1,731 pre-glazed unitized panels on the project with the largest panel at 11’ x 15’-9 ½”. The unitized system incorporates vision and spandrel glass, ACM panels and Taktl. The u-value for the unitized system is 0.19. This project required 2% story drift per code. Goldfinch Bros., Inc. worked with Schuco to modify the existing FWS 60SG system to exceed this requirement at 2.2%. The system was fully tested for air, water, and structure.

Testimonials

Trusted by thousands of happy customers.